MK8 was the first in the “bridge-bar” series of foundations using 1 ¼” 191K yield PT bar in 150 grade as the main load transfer beam.
Top bars counter the upload while the bottom beam bars redirect downloads and distribute to the slab grid bar generating the 2 way re-enforced concrete action.